Photo Index

Have a look at a pictorial history of the rebuild:

29th May 2002 Begin removing front end parts.
13th June 2002 LC0926 is loaded on to a trailer ready for it's next journey.
14th June 2002 - 1 Moving 926 to Hampshire for engine removal, start of removing the engine.
14th June 2002 - 2 Complete removal of the engine and gearbox.
15th June 2002 Engine's out, start cleaning the engine bay. How many LC's at one house?
15th September 2002 Removal off offside bodykit and the horrors underneath!!
17th September 2002 All of the bodykit now removed, revealing the tin worm.
4th November 2002 Stripped and straightened.
14th December 2002 All the new metal has been put in the front and the wing modified.
21st February 2003 With the engine stripped, cleaning and inspection begins.
22nd February 2003 Engine re-assembly half way through.
3rd March 2003 The painted car awaiting movement back to Hampshire.
10th March 2003 Soon to be reunited with the engine and gearbox.
12th March 2003 Refitting the engine.
15th March 2003 Reconnecting the engine and start up!!
20th April 2003 Slowly refitting the bodykit
27th April 2003 Everything back on except sills, front bumper and bonnet vents.
11th June 2003 Refitting off some of the engine bay components and one sill
10th August 2003 Looking like a Lotus Carlton again, but a long way to go!!
27th December 2003 Rustproofing of the front wheelhouses and refitting the new bonnet cowling.
28th February 2004 Refitting of the freshly painted engine covers
6th March 2004 Hand finishing of the painted engine components

Back to:

0926G Home